Changes for page CFEL TapeDrive: Serial Crystallography
Last modified by chatzies on 2025-11-27 11:35
Summary
-
Page properties (1 modified, 0 added, 0 removed)
-
Objects (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,18 +1,66 @@ 1 1 {{layout}} 2 2 {{layout-section ac:type="single"}} 3 3 {{layout-cell}} 4 -[[image:attach:TapeDrive_beschriftet-tile.jpg||height=" 250"]]4 +[[image:attach:TapeDrive_beschriftet-tile.jpg||height="400"]] 5 5 6 6 \\ 7 7 8 - {{toc minLevel="2"/}}8 +\\ 9 9 10 10 \\ 11 11 12 -- ---12 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.1RevertfromCrystallographytoTapeDrive(P11staff/CFEL)"/}}**14.1 Revert from Crystallography to TapeDrive (P11 staff/CFEL)** === 13 13 14 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14.1Samplecharacteristicsandpreparation"/}}**14.1 Sample characteristics and preparation** == 14 +* remove vortex 15 +* beamstop to out-position? 16 +* remove goniometer. The airbearing should be stopped (p11/servermotor/eh.1.01) 17 +* move cryojet out of the way, ramp the cryo up and shut it down. Close the compressed air to the shield flow. The biggest cable kinks and needs to be disconnected. 18 +* stop refill of the robot dewar and empty the dewar, warm up. 19 +* Disable backlight (unplug Festo connection). (% style="color: rgb(255,0,0);" %)//Is this still needed?// 20 +* (% style="color: rgb(0,0,0);" %)mount the 10 um diode and connect (via connector on the granite). This is connected to the leftmost Keithly (power up, check that settings are gain E06, Filter on, Rise time 1 ms. Keithly is connected to the oscilloscope and the delay generator, delay generator is connected to oscilloscope and detector, see diagram in P11 wiki. (% style="color: rgb(0, 0, 0); color: rgb(255, 0, 0)" %)//Insert here the setting for oscilloscope//(% style="color: rgb(0,0,0);" %)//. //Make sure to connect the multi-trigger to the back of the detector instead of the standard trigger, when starting to use the chopper (pull the thin ring with ‘grip’ area to detach). Cables are labeled. Make sure before using the chopper that the channels are enabled. 21 +* (% style="color: rgb(0,0,0);" %)move goniotower to X ~~ 17 000 15 15 23 +(% style="color: rgb(0,0,0);" %)Mounting of the TapeDrive is done by the CFEL group. Electronics and control units are combined on a small shelf, that requires only one power and network plug-in. The shelf will be placed left-sided (looking upstream) to the detector tower. The ElveFlow and control laptop as well as several necessary consumables are placed on a cart, which is to be positioned on the right (looking upstream) against the robot platform. The CFEL chiller is placed on the right of the platform and connected to the TapeDrive GASnozzle. 24 + 25 +\\ 26 + 27 +* adjust focus of the tape by moving X in goniometer tower until you see it in the overview camera. Final adjustment should be done when there is flow. Latest value is about 4500 in X and also 5000 in Z (higher soft limit changed from 2976,63 to 6000). (% style="color: rgb(255,0,0);" %)//Better to use the back illumination in the GUI to focus the tape - old instruction, not sure if this is the case. Back illumination is the external light source in the detector tower (the crystallography backlight should be disable for tapedrive).// 28 +* (% style="color: rgb(0,0,0);" %)Check the Minimum Detector Distance; the detector should not collide with the tapedrive while driven to 154 mm but it has to be verified. Also check that all cables and capillaries are taped away when the users start, so that nothing protrudes further than the tapedrive itself. Soft limit can be edited in eh.3.11 Atk panel. 29 +* (% style="color: rgb(0,0,0);" %)Reconfirm the alignment of the beamstop, once everything, including the nozzle, is in place. Modify config.ini for beamstop in- and out-position to both mach in (27 000). This way the beamstop will not be driven out when the hutch is opened, to avoid that the users forget to drive it in when restarting after entering the hutch. 30 + 31 +\\ 32 + 33 +Prepare necessary controls for data collection: 34 + 35 +* ATK panels: 36 +** p11/simplon_filewriter/eh.01 37 +** p11/simplon_detector/eh.01 38 +*** count time = 0.0075 39 +*** trigger (**ints **if working without the chopper, # or triggers is 1, **exts** if with the chopper, # or triggers = number of images). Exts is also the standard trigger in normal crystallography. If GUI is used to take images (e.g. for beamstop alignment) the trigger mode will be forced by that and needs to be reverted manually for the users to continue. 40 +*** numer of images = 100 000 41 +*** number of images in container = 1000 42 +*** mode 16m/4M 43 +*** detector distance = 200 mm (usually) 44 +** p11/detectortower 45 +** p11/motor/eh.09 46 +* remote access to TapeDrive control laptop: 47 +** open terminal, execute command: xfreerdp +clipboard /size:1920x1080 /u:Cfelusr /v:cfeld-pcx22611 48 + password: //written on control laptop 49 +// 50 +* Cameras: 51 +** haspp11ethcam1 → detector tower camera to monitor nozzle 52 +** haspp11ethcam4 → goniometer camera to monitor tape from above 53 +* OnDa (on haspp11user04): 54 +//This starts both GUIs (Frame Viewer & Crystallography GUI) and onda-monitor, the server component. The tool has a bunch of parameters which you can list with ./onda-runner.py —help.//\\ 55 +** 16M mode → cd /home/p11user/CfelSoft/202103_onda 56 + ./onda-runner.py onda-config/onda-config-Eiger16M.toml 57 +** 4M mode → cd /home/p11user/CfelSoft/202103_onda 58 + ./onda-runner.py onda-config/onda-config-Eiger4M.toml\\ 59 + 60 +\\ 61 + 62 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.2Samplecharacteristicsandpreparation"/}}**14.2 Sample characteristics and preparation** === 63 + 16 16 suspension of microcrystals, **at least** 200 µL with 20% crystal density(more is always better), size range: 2-30 µm, **tip:** bring some mother liquor for washing, filtering, diluting etc. 17 17 18 18 Preparation: ... ... @@ -23,11 +23,9 @@ 23 23 24 24 \\ 25 25 26 ----- 74 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.3ConnectingsampletoElveFlow,sampleexchange"/}}**14.3 Connecting sample to ElveFlow, sample exchange 75 +** === 27 27 28 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14.2ConnectingsampletoElveFlow,sampleexchange"/}}**14.2 Connecting sample to ElveFlow, sample exchange 29 -** == 30 - 31 31 After filtration, screw the ElveFlow connector to your Eppendorf or Falcon tube. Make sure that the yellow-ish line goes to the bottom of your tube. You can adjust the length by unscrewing the blue fitting on top and pushing/pulling the yellow-ish line. **Don't forget to tigthen the blue fitting afterwards!** 32 32 33 33 Be aware to which channel and nozzle line your sample is connected. ... ... @@ -44,11 +44,9 @@ 44 44 45 45 \\ 46 46 47 ----- 93 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.4TapeDriveoperation"/}}**14.4 TapeDrive operation 94 +** === 48 48 49 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14.3TapeDriveoperation"/}}**14.3 TapeDrive operation 50 -** == 51 - 52 52 The TapeDrive is controlled through kamzik. To open kamzik, start the server. A terminal will open and shortly after a small window. 53 53 Now start the client. Same thing, a terminal will open, shortly after a small window. 54 54 ... ... @@ -55,7 +55,7 @@ 55 55 Click 'Devices' in the **client session** to open the control window. 56 56 [[image:attach:screen.PNG||height="250"]][[image:attach:server client.PNG||height="250"]] 57 57 58 - ==== {{id name="14.SerialCrystallography:CFELTapeDrive-Tape"/}}**Tape**====102 +**Tape** 59 59 60 60 * Click on the 'main tape' icon 61 61 * Change the velocity by typing anything from **0.3-3.0 mm/s** ... ... @@ -75,7 +75,6 @@ 75 75 (% style="color: rgb(255,0,0);" %)**!!! **(% style="color: rgb(255, 0, 0); color: rgb(0, 0, 0)" %)**During data collection make sure in which direction you are moving, do not move nozzle into beam**(% style="color: rgb(255,0,0);" %)** !!!**(%%) 76 76 \\Adjust the nozzle position by eye until it nearly touches the tape and roughly meets the X-ray interaction point. Then, move to the control hutch to use the on-axis microscope for fine adjustment. Move the nozzle tip to the beam position (red X) and write down the absolut nozzle position. From there move the nozzle in +x to your desired distance.Different distances combined with the tape speed result in several delay times for time-resolved experiments. 77 77 78 -(% class="wrapped" %) 79 79 |=((( 80 80 \\ 81 81 )))|=((( ... ... @@ -145,10 +145,8 @@ 145 145 146 146 \\ 147 147 148 -- ---191 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.5Taperollexchange"/}}**14.5 Tape roll exchange** === 149 149 150 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14.4Taperollexchange"/}}**14.4 Tape roll exchange** == 151 - 152 152 The tape stops automatically at 98% used length, if you need to change the rolls for orther reasons, stop the tape (velocity = 0.0 mm/s). 153 153 154 154 * Remove the (almost) empty feeder roll by pulling it upwards. ... ... @@ -170,17 +170,14 @@ 170 170 171 171 \\ 172 172 173 -** 174 -** 214 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.6Nozzleexchange"/}}**14.6 Nozzle exchange** === 175 175 {{/layout-cell}} 176 176 {{/layout-section}} 177 177 178 178 {{layout-section ac:type="single"}} 179 179 {{layout-cell}} 180 -- ---220 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.7Chopper"/}}**14.7 Chopper** === 181 181 182 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14.5Chopper"/}}**14.5 Chopper** == 183 - 184 184 start chopper gui from terminal: 185 185 186 186 (% class="code" %) ... ... @@ -191,7 +191,6 @@ 191 191 (% class="code" %) 192 192 ((( 193 193 python chopperControl.py 194 -\\\\ 195 195 ))) 196 196 {{/layout-cell}} 197 197 {{/layout-section}} ... ... @@ -218,9 +218,9 @@ 218 218 {{/layout-cell}} 219 219 {{/layout-section}} 220 220 221 -{{layout-section ac:type=" two_equal"}}258 +{{layout-section ac:type="single"}} 222 222 {{layout-cell}} 223 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14. 6Datacollection"/}}**14.6Data collection** ==260 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.8Datacollection"/}}**14.8 Data collection** === 224 224 225 225 Once the hutch is interlocked, set remote control to the TapeDrive laptop by opening a terminal and executing the following command: 226 226 ... ... @@ -230,43 +230,33 @@ 230 230 password: written on control laptop (changes every 6 months) 231 231 ))) 232 232 233 - //>>usually the terminal is open, just repeat previous command with arrow up, enter and type in the password// 270 + //>>usually the terminal is open, just repeat previous command with arrow up, enter and type in the password// 234 234 235 235 \\ 236 236 237 - **Checklist:**274 +Click "Start" icon in kamzik. 238 238 239 - (% style="color:rgb(255,0,0);" %)//alwaysafterenteringthehutch!//276 +[[image:attach:kamzik_run-tile.jpg||height="400"]] 240 240 241 -(% style="color: rgb(0,0,0);" %)Click "Safety" icon in kamzik. 242 - 243 -* Put collimator in 244 -** Click "<Call>" next to //collimator_in// 245 - 246 -\\ 247 - 248 -* Open beam shutter BS1 in //CrystalControl// 278 +---- 249 249 {{/layout-cell}} 250 - 251 -{{layout-cell}} 252 -[[image:attach:kamzik_safety.PNG||height="400"]] 253 -{{/layout-cell}} 254 254 {{/layout-section}} 255 255 256 -{{layout-section ac:type=" single"}}282 +{{layout-section ac:type="two_equal"}} 257 257 {{layout-cell}} 258 - ----284 +**Check list:** 259 259 260 - Click"Start/Run"iconinkamzik.286 +(% style="color: rgb(255,0,0);" %)//always after entering the hutch!// 261 261 262 -[[image:attach:kamzik_run-tile.jpg||height="400"]] 288 +* Open BS1 (//CrystalControl)// 289 +* Put collimator in (//CrystalControl)// 290 +* Check beamstop position = 27 000 (//Atk panel p11/motor/eh.3.09)// 291 +* Open fast shutter (//CrystalControl)// 292 +* Check diode voltage ~~ 0.0 (//kamzik Run/Diode voltage)// 293 +* Close fast shutter (//CrystalControl)// 263 263 264 ----- 265 -{{/layout-cell}} 266 -{{/layout-section}} 295 +\\ 267 267 268 -{{layout-section ac:type="two_equal"}} 269 -{{layout-cell}} 270 270 **Set run parameters and go 🏃💥** 271 271 272 272 1. Set your desired No. of frames ... ... @@ -277,17 +277,19 @@ 277 277 278 278 \\ 279 279 280 - \\307 +(% style="color: rgb(153,51,102);" %)**//Current bug~://** 281 281 282 - **After datacollection/before enteringthe exp.hutch**309 +(% style="color: rgb(0,0,0);" %)You need to "Stop" run in kamzik manually after all images have been acquired. This moves the shield up and closes the fast shutter. Afterwards you can start a new run by clicking "<Call>". 283 283 284 -1. Go to "Safety" in kamzik. 285 -1. Click "<Call>" next to //prepare_to_open_hutch. //This will automatically: 286 -11. Drive the collimator out 287 -11. Drive the detector back to 1500 mm 288 -1. Close beam shutter BS1 and break door interlock in //P11 XRayFeed //(monitor top left). 289 289 290 -[[image:attach:Screenshot from 2022-04-04 19-36-29.png||height="400"]] 312 +(% style="color: rgb(0,0,0);" %)Check progress in terminal with: 313 + 314 +(% class="code" %) 315 +((( 316 + cd /gpfs/current/raw/scan_frames 317 + watch "ls -lrt <run number>/ | tail" 318 +\\\\\\\\ 319 +))) 291 291 {{/layout-cell}} 292 292 293 293 {{layout-cell}} ... ... @@ -360,7 +360,7 @@ 360 360 {{layout-cell}} 361 361 ---- 362 362 363 -== {{id name="14.SerialCrystallography:CFELTapeDrive-14. 7Troubleshooting"/}}**14.7Troubleshooting**==392 +=== {{id name="14.SerialCrystallography:CFELTapeDrive-14.9Troubleshooting"/}}14.9 Troubleshooting === 364 364 365 365 * ((( 366 366 ==== {{id name="14.SerialCrystallography:CFELTapeDrive-Tapestopped"/}}Tape stopped ==== ... ... @@ -388,41 +388,6 @@ 388 388 * Sample empty? 389 389 * Nozzle or lines clogged? → flush with water, change nozzle 390 390 ))) 391 - 392 -\\ 393 - 394 -* ((( 395 -==== {{id name="14.SerialCrystallography:CFELTapeDrive-Simplonfilewriter/eigerstreamissues"/}}Simplon filewriter/eiger stream issues ==== 396 - 397 -* First, restart kamzik (server+client) and see if this solves the issue 398 -* If not, restart the Simplon server (in Astor → haspp11exp03, right click on Simplon/EH.1 and restart) 399 -* ((( 400 -If nothing works, kill the Simplon process and then start the server again:* ((( 401 -(% class="code" %) 402 -((( 403 -ssh haspp11exp03 404 -))) 405 -))) 406 -* ((( 407 -(% class="code" %) 408 -((( 409 -ps -ef | grep Simplon 410 -))) 411 -))) 412 -* ((( 413 -(% class="code" %) 414 -((( 415 -kill -9 simplon_process_id 416 -))) 417 -))) 418 -))) 419 -))) 420 420 {{/layout-cell}} 421 421 {{/layout-section}} 422 - 423 -{{layout-section ac:type="single"}} 424 -{{layout-cell}} 425 -\\ 426 -{{/layout-cell}} 427 -{{/layout-section}} 428 428 {{/layout}}
- Confluence.Code.ConfluencePageClass[0]
-
- Id
-
... ... @@ -1,1 +1,1 @@ 1 -2 501786231 +236824590 - URL
-
... ... @@ -1,1 +1,1 @@ 1 -https://confluence.desy.de/spaces/11/pages/2 50178623/14. Serial Crystallography: CFEL TapeDrive1 +https://confluence.desy.de/spaces/11/pages/236824590/14. Serial Crystallography: CFEL TapeDrive