Last modified by hakanj on 2025-07-08 15:59

From version 6.1
edited by hakanj
on 2020-12-17 08:32
Change comment: There is no comment for this version
To version 5.1
edited by hakanj
on 2020-12-17 08:21
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,32 +1,2 @@
1 1  (% class="Body" %)
2 -There is no need to log-in or log-out of the computers, each assigned user group has the corresponding beamtime ID opened prior to their experiment by their local contact. The data will accumulate to beamline filesystem at /gpfs/current, as displayed in the CrystalControl GUI. Please leave the computers and displays on at the end of your shift.
3 -
4 -(% class="Body" %)
5 -\\
6 -
7 -(% class="Body" %)
8 -Manual data processing during an on-site shift is only allowed at haspp11eval01. Please follow the instructions in the hutch.
9 -
10 -(% class="Body" %)
11 -\\
12 -
13 -(% class="Body" %)
14 -The beamline computers are not accessible from outside nor during the remote session, access to the remote data collection is only via remote session in Door, as described at
15 -
16 -(% class="Body" %)
17 - [[https:~~/~~/photon-science.desy.de/facilities/petra_iii/beamlines/p11_bio_imaging_and_diffraction/user_information/remote_access/BX90_01_eng.html>>url:https://photon-science.desy.de/facilities/petra_iii/beamlines/p11_bio_imaging_and_diffraction/user_information/remote_access/BX90_01_eng.html||shape="rect"]].
18 -
19 -(% class="Body" %)
20 -\\
21 -
22 -(% class="Body" %)
23 -During remote operation, manual data processing can take place at the core filesystem via Maxwell cluster with a scientific account. Please follow the instructions at:
24 -
25 -(% class="Body" %)
26 - [[https:~~/~~/photon-science.desy.de/facilities/petra_iii/beamlines/p11_bio_imaging_and_diffraction/user_information/data_access_processing_and_transfer/BX90_01_eng.html>>url:https://photon-science.desy.de/facilities/petra_iii/beamlines/p11_bio_imaging_and_diffraction/user_information/data_access_processing_and_transfer/BX90_01_eng.html||shape="rect"]]
27 -
28 -(% class="Body" %)
29 -\\
30 -
31 -(% class="Body" %)
32 -At the end of remote session, there is no need to log-off from the remote, the access will be revoked by the staff and user can just close the browser window. Please note that logging off from remote by a user will terminate the entire remote session for all users.
2 +There is no need to log-in or log-out of the computers, each assigned user group has the corresponding beamtime ID opened prior to their experiment by their local contact. The data will accumulate to /gpfs/current, as displayed in the CrystalControl GUI. Please leave the computers and displays on at the end of your shift.
Confluence.Code.ConfluencePageClass[0]
Id
... ... @@ -1,1 +1,1 @@
1 -188795813
1 +188795812
URL
... ... @@ -1,1 +1,1 @@
1 -https://confluence.desy.de/spaces/11/pages/188795813/4. Access to the beamline computers
1 +https://confluence.desy.de/spaces/11/pages/188795812/4. Access to the beamline computers