Load frame
Overview
- Forces up to 1 kN (both pushing or pulling)
- Load cells 20N, 50N, 100N, 200N, 500N and 1000N available
- Fully integrated into control and logging system
Actuator
PIMicos MA-35 | |
---|---|
max. load (in travel direction) | 1000N |
Travel range | ? mm |
max. speed | 5000 µm/s |
Step width | 1/20 µm |
fine pitch thread | M(8 x 1.0) x 45 ??? |
Load cells
Two types of load cells are available with different diameters with the following force range
large | small |
---|---|
20 N | - |
50 N | - |
100 N | - |
200 N | 200 N |
- | 500 N |
- | 1000 N |
thread: M8 (max len 15 mm) | thread: M4 (max len 6 mm) |
Load frame assembly
Considering different applications (high forces, low forces, pushing or pulling) the assembly follows slightly different paths. Generally, assembling the load frame can be broken down into these steps:
- Install a base plate on the rotation stage (use spacers, decide which plate to use)
- Mount load cell on base plate with desired pin or clamp (depending on push or pull experiments)
- Mount sample tube (choose the tube type according to your application)
- Mount pusher
Large load cell installation
For the large load cell a specific base plate has to be used
Base plate with load cell | Load cell with pin (M5 gaused for pulling |
Mount bridge and guide - there are two different types of tube, so assembly depends on your choice of tube:
Tube with thread ring
Bridge | Brigde and pin guide | Tube with thread ring |
Tube with internal thread
Bridge | Bridge and pin guide | Tube with internal thread |
Pin for pulling
Total length | 56 mm |
Thread at load cell | M8 x 6 |
Thread top part | M5 x 14 |
Pin guide in brigde diameter | 6 mm |
Small load cell installation
For the small load cell a specific base plate has to be used
Base plate with load cell | Load cell with pin used for pulling |
Mount pin guide and bridge - there are two different types of tube, so assembly depends on your choice of tube:
Tube with thread ring
Pin guide, no bridge necessary Distance top load cell - top bridge surface: 23.5mm (+ 6 mm thread of load cell) For own | Tube with thread ring |
Tube with internal thread
Pin guide | Bridge | Optionally: insert push pin | Tube with internal thread |
Pin fro pulling
Total length | 80 mm |
Thread at load cell | M4 x 4 |
Thread top part | M5 x 35 |
Pin guide in brigde diameter | 6 mm |
Tubes
Different Tubes with lengths of 80 mm, 140 mm and 160 mm |
Sample mounting
Pushing | Pulling | ||
---|---|---|---|
Bottom push pin | Bottom pull thread | ||
Top push pin | Principle of pull installation | ||
Top push pin | Pull clamps for low forces |
Reference
Moosmann et al. "A load frame for in situ tomography at PETRA III", Proc. SPIE 11113, Developments in X-Ray Tomography XII, 1111318 (2019); https://doi.org/10.1117/12.2530445